Blackhorse Lane project involved providing a solution for hot corridors and air changes in the common areas, with complete control from the cloud.

Safety
Sustainability
Technology
Case-Study-Blackhorse-Lane-2
Case-Study-Blackhorse-Lane-3

Blackhorse Lane project involved providing a solution for hot corridors and air changes in the common areas, with complete control from the cloud. The project involved six cores in total, each core with duty standby extract fan.

To be able to use off the shelf equipment and install it into tight spaces to meet the architects vision of the aesthetic view of the building.

By using six inch inline fans and slot dampers we were able to provide a day to day ventilation thermostatically controlled and overridden from the cloud. This would pull cool air from the staircase through the lobby and exhaust in to the smoke shaft upon any fire activation, this would turn off and create a fire barrier.

Discover Recent Projects

AstraZeneca

The controls were difficult in conception being able to fulfil the client's expectations because we used the SE Controls Shevtec range we were able to meet every requirement.

Read more

Great Ormond Street Hospital

To reuse the existing dampers and doors to get a functional system for occupation in September by the 2022 intake of students.

Read more

Goldsmid House

To reuse the existing dampers and doors to get a functional system for occupation in September by the 2022 intake of students.

Read more

Nomura Bank

We were contacted originally in 2020 to investigate and maintain a multi smoke shaft system with Bilco staircase roof hatches in the city by upper Thames Street.

Read more

Harbour Central

Harbour Central is a vast residential new build on the Isle of Dogs, we are currently installing and commissioning a smoke ventilation system.

Read more

Odessa Street

Odessa Street is a new build apartment block in SE16. Our brief was to install a smoke vent system to a design by others, completely driven by the cloud for natural ventilation and activation by the fire alarm system.

Read more

Portcullis House

Portcullis House atrium originally built in 2000 and had been beset with mechanical problems when attempting to open the diamond shaped glass roof vents.

Read more

Bournehall House

Bournehall House was an office development converted into apartments, we were contacted to install a modern smoke ventilation system. We commissioned a fire engineered solution via a CFD Model.

Read more

Blackhorse Lane

Blackhorse Lane project involved providing a solution for hot corridors and air changes in the common areas, with complete control from the cloud.

Read more