The controls were difficult in conception being able to fulfil the client’s expectations but because we used the SE Controls Shevtec range we were able to meet every requirement.
Discover Recent Projects
AstraZeneca
The controls were difficult in conception being able to fulfil the client's expectations because we used the SE Controls Shevtec range we were able to meet every requirement.
Great Ormond Street Hospital
To reuse the existing dampers and doors to get a functional system for occupation in September by the 2022 intake of students.
Goldsmid House
To reuse the existing dampers and doors to get a functional system for occupation in September by the 2022 intake of students.
Nomura Bank
We were contacted originally in 2020 to investigate and maintain a multi smoke shaft system with Bilco staircase roof hatches in the city by upper Thames Street.
Harbour Central
Harbour Central is a vast residential new build on the Isle of Dogs, we are currently installing and commissioning a smoke ventilation system.
Odessa Street
Odessa Street is a new build apartment block in SE16. Our brief was to install a smoke vent system to a design by others, completely driven by the cloud for natural ventilation and activation by the fire alarm system.
Portcullis House
Portcullis House atrium originally built in 2000 and had been beset with mechanical problems when attempting to open the diamond shaped glass roof vents.
Bournehall House
Bournehall House was an office development converted into apartments, we were contacted to install a modern smoke ventilation system. We commissioned a fire engineered solution via a CFD Model.
Blackhorse Lane
Blackhorse Lane project involved providing a solution for hot corridors and air changes in the common areas, with complete control from the cloud.